The Saraji Coal Handling Preparation Plant was modeled and co-coordinated with the design engineer to enable changes to be made during detailing. The detailing contract undertaken for the Thiess Sedgmann joint venture was completed on schedule.
CLICK ON IMAGES TO ENLARGE & VIEW FULL GALLERY
Sonoma Coal Project (2007)
PHOTOS
MODEL
Alpetros Design was contracted by Melco Engineering to supply the 800 tonne per hour rail load out plant and conveyor systems. The contract work was made up of dump hopper, load out bin, wing wall, grizzly, support steelwork, feeder/fines/head chutes, conveyor modules/trestles/gantries and associated structures. Delivery of the project was achieved on schedule.